This analysis is an expanded version of a presentation to the Ohio River Valley Institute.
Appalachia is poised for a renewed buildout of climate-killing infrastructure as gas companies, emboldened by sweeping regulatory rollbacks, double down on investments in gas-fired power plants, LNG export terminals, and the pipelines that connect them.
Regulatory rollbacks
On May 21, 2026, the Federal Energy Regulatory Commission (FERC) announced plans to advance a set of comprehensive reforms that would reduce regulatory hurdles and make it easier for developers to build new pipelines across the US. If enacted, the proposal would weaken project-specific oversight, waive environmental reviews, and limit public involvement for major expansion projects. The new rules are particularly alarming as gas companies, encouraged by surging energy demand from data centers and LNG exports, double down on an unprecedented buildout of new gas-fired power plants, storage facilities, and the pipelines that supply them.
At the center of the Notice of Proposed Rulemaking, which outlines the agency’s draft rule, are “blanket authorizations,” or the ability of pipeline companies with existing blanket certificates to undertake projects on their pipelines and related infrastructure without undergoing the full certificate process as required by the National Gas Act. Historically, blanket authorizations have allowed interstate pipeline companies to perform routine construction and facility upgrades without obtaining a specific, case-by-case certificate. The types of projects previously allowed were limited by scope and cost thresholds, which prevented significant increases in mainline capacity.
The draft rule proposes to more than double project cost limits, broadens the types of projects to which blanket authorizations can apply, and allows pipeline companies to finance projects by charging higher rates. One legal analyst described the proposal as “the most significant natural gas permitting reform in two decades–and its practical implications reach every segment of the industry.”
If it were its own country, Appalachia would be the third largest producer in the world, behind only Russia and the US. Still, Appalachian gas producers have been hamstrung by pipeline takeaway capacity limits for years, holding the region’s gas production steady between 34 and 36 billion cubic feet per day (Bcf/d). FERC’s rules could change that, unleashing a renewed buildout of pipelines across Appalachia that could connect the region’s producers to new gas-fired power plant additions and LNG export terminals expanding along the Gulf Coast.
Plans for pipeline expansions
Nearly every major interstate gas pipeline system that crosses through Appalachia is now subject to expansion proposals. At least 14 pipeline projects originating in Pennsylvania, Ohio, West Virginia, or neighboring states could expand Appalachia’s takeaway capacity by as much as 8.3 Bcf/d. They would do so by installing looping (adding a parallel line to an existing pipeline), adding compression, and replacing existing pipelines. All would qualify for blanket authorizations under FERC’s proposed rule.
In May, Canada’s TC Energy announced plans for a massive, $1.5 billion expansion project along the Columbia Gas Transmission system, which runs through Kentucky, Maryland, Ohio, Pennsylvania, Virginia, and West Virginia. The so-called “Appalachia Supply Project” would add 0.8 Bcf/d of capacity for new gas-fired power generation driven by data centers, and would be scalable up to 2.0 Bcf/d through future expansions. According to the Canadian gas giant, gas demand in Ohio alone is projected to grow 30% over the next decade, driven by power generation and over 40 new data centers.
New pipelines target Pennsylvania

Further north, Enbridge is planning to expand the Algonquin Gas Transmission, a 1,130-mile, 3.1 Bcf/d pipeline that transports Appalachian gas from Pennsylvania to New England, through a series of upgrades that could be potentially sanctioned under FERC’s expanded blanket authorizations.
Revived pipelines expand takeaway capacity into New England

Meanwhile, Williams revived two major projects: the Northeast Supply Enhancement project, which would expand capacity along the Transco pipeline, and the Constitution Pipeline, a 125-mile greenfield pipeline that would run from northeast Pennsylvania to Schoharie County, New York.
Though still in early development, Boardwalk has expanded the scope of its proposed Borealis Pipeline, a 2 Bcf/d greenfield pipeline that would install 200 miles of new gas pipeline in Ohio and add another 265 miles of new pipeline along the Texas Gas Transmission system, a 6,000 mile interstate pipeline network that links the Midwest and Gulf Coast. The projects would increase the flow of Appalachian gas into southeastern Ohio and Indiana, states with significant behind-the-meter data center development, as well as link Appalachian gas producers with customers in the Southeast and Gulf Coast.
Pipelines to increase takeaway capacity to Midwest & Southwest

Global energy supply shocks boosts US LNG
To say the first half of 2026 has been rocky for global LNG markets would be an understatement. The US-Iran War and the extended closure of the Strait of Hormuz stranded significant volumes of LNG and crude oil, and temporarily took Qatari LNG offline, effectively reducing the global oil and gas supply by 20%. The conflict caused LNG prices to spike globally, and they have remained persistently high apart from a temporary cease-fire in June.

Despite the global volatility, Henry Hub prices–the benchmark price point for US natural gas–have remained largely insulated from the price fluctuations seen in Asia and Europe, making US LNG all the more attractive to international buyers.
LNG exports draw Appalachian gas south
In April, the Department of Energy authorized two LNG export terminals to increase export capacity to countries lacking free trade agreements. But US LNG facilities are already running at high utilization rates, and a significant increase in exports can only increase at the pace of terminal and pipeline buildout. Though nearly all of the planned capacity additions are concentrated along the Gulf Coast, a slew of pipeline expansions that connect Appalachian gas to Gulf LNG terminals is underway.
US LNG capacity expands, pulling Appalachia gas south

In its 2026 Annual Energy Outlook, the US Energy Information Administration confirmed that LNG exports continue to be the fastest-growing source of domestic natural gas demand. Seven LNG terminals will add 6.3 Bcf/d of export capacity through the end of 2027, in addition to capacity additions through 2030 that will increase overall capacity to 27.7 Bcf/d.
Proposed data centers drive up gas demand, pipelines follow
It is becoming clear that gas industry buildout is closely aligned with data center development. As data center developers double down – prioritizing reliability and speed to market by sourcing natural gas-fired generation over renewables – gas companies are incentivized to undertake major expansion projects.
Earlier this year, TC Energy CEO Francois Poirier told investors, “Ohio’s projected natural gas demand growth of more than 30% over the next decade is the largest increase nationally outside of LNG-exporting states.” He added, “Growth is being driven by power generation, industrial expansion and grid reliability needs, including significant incremental load from more than 40 new data centers.”
For instance, SB Energy is proposing to build a 10 GW gas-fired power plant in Piketon, Ohio that would serve a neighboring data center. If built, the so-called PORTS Energy Center would be the largest operating gas plant in the country.
Map of TC Energy’s Columbia Gas Transmission system and planned data centers

These pipeline expansions could be accelerated and harder to fight if FERC’s proposed rule to expand blanket authorizations is adopted.
An RBN analysis indicates there could be a very large increase in gas demand for power generation, especially as existing power plants utilize more of their capacity. But the demand could be much greater if “behind-the-meter” (BTM) mega projects are constructed, such as the Shippingport Power Station in Beaver County, Pennsylvania or the Nscale Monarch data center in West Virginia. According to the analysis, just a handful of BTM facilities could trigger more than 1.2 Bcf/d of demand, if they achieve their planned capacity (which may be unlikely). Still, the projects identified in this analysis represent only a fraction of proposals under consideration for the region. Just as importantly, each of these massive BTM projects would necessitate a network of pipeline expansions within the Appalachian region, including the construction of new laterals to the new facilities.
Petrochemicals temporarily boosted by global conflict
US petrochemical companies saw a brief spike in profit margins following the closure of the Strait of Hormuz and the ensuing disruptions to global trade of refined oil and gas products. This marked a huge turnaround from baseline conditions in early 2026, which had been marked by oversupply and underwhelming demand growth.
The longer disruptions continue, the greater the likelihood of a renewed push to expand the petrochemical, plastics, and ammonia industries in the US.
Still, most experts believe the boost will be temporary. By early June, ethane cracker margins had come back down, driven by lower feedstock prices. Patrick Penfield, Professor of Supply Chain Management at Syracuse University, noted that “once the conflict ends and supply chains normalize, the industry will likely revert toward those pre-war dynamics rather than sustaining today’s elevated margins.”
Government forecasts for major production growth depend on pipeline buildout
Gas production in Appalachia is expected to increase by just 1 Bcf/d between 2025 and 2027, according to the EIA. Looking ahead into the next decade, however, the picture looks much different. In this year’s Annual Energy Outlook, the EIA increased its long-term production forecasts for Appalachia. The agency predicts Appalachian gas production could reach 66 Bcf/d to 73 Bcf/d by 2050–doubling today’s volumes.

While rising demand from within Appalachia will support some of the projected production growth, the agency warns that “major growth can only occur if new pipelines are built to transport gas out of Appalachia.” And, FERC’s newest reforms could make it easier for developers to build them.